To Pacific Waves Building (PWB) Residents.

At its last Executive Committee (EC) meeting, the EC resolved to re-paint the concrete surfaces within the garbage room, the loading bay and the meeting/library room, outside the Building Managers office.

Accordingly, these works have been scheduled to take place commencing Tuesday the 11th August 2015.

Regrettably there will be no access to this area for the duration of the works, the works are estimated to take 3 days to complete.

For your convenience, the garbage bins will be temporarily placed as shown in the picture below.

If you park in the resident’s car park please use the door at level 1 for access to and from your car.

If you have a bicycle currently stored in the loading bay please remove it by Monday the 10th August to avoid it being removed by others. Bicycles not removed prior to this date will have their locks cut.

We regret any inconvenience.

Thank you, Tony Strati,
Building Manager, on behalf of the Owners Corporation – Deposited Plan 61139